← Back to all articles
arXiv cs.AIOctober 7, 2026

Bi-objective chance-constrained evolutionary optimization for large-scale open-pit mine scheduling under geological uncertainty

Excerpt

arXiv:2511.08275v2 Announce Type: replace-cross Abstract: The open-pit mine scheduling problem (OPMSP) is a complex optimization problem in long-term mine planning that involves numerous operational and geological constraints. Traditional deterministic approaches often ignore geological uncertainty, leading to suboptimal or unreliable production schedules. Chance constraints provide a framework for handling uncertainty by ensuring that probabilistic constraints are satisfied with a predefined co